Luxury 2024 AWD Sprinter Camper Van, Sleeps 3 w/ Indoor Shower

5.0

Excellent

19 trips

25+

Sleeps 3

23 ft. long

4 guests

AWD Adventure Van, Built for Comfort and ExplorationThis beautifully custom built 2024 Mercedes Sprinter 2500 AWD combines a refined, high end interior with true adventure capability. Perfect for couples, small families, or travelers who want to explore without giving up comfort, it’s designed to feel premium inside and capable everywhere else.Inside, you’ll find a warm, modern interior with a queen bed, refrigerator, sink, 15amp electrical outlets, LED cabin lights, indoor shower, hot water, air conditioning, and cabin heat. Go glamping in style, while flexible seating can be configured for 2, 3, or 4 passengers depending on your getaway.Built for more than just campgrounds, this lifted AWD Sprinter features upgraded suspension and off-road tires, giving you extra confidence for mountain getaways, desert trips, coastal escapes, and national park adventures. Solar panels make off-grid camping easy, giving you the freedom to travel farther out and stay connected to the essentials. Outside, an awning and exterior shower turn any campsite into basecamp, rinse off after the trail, then kick back in the shade.Easy to drive, comfortable to live in, and ready for memorable trips, backup camera helps you park anywhere. This van offers the best of both luxury and adventure.What's includedThis van is stocked to get you on the road faster, so you can spend less time packing and more time enjoying. It includes a fully equipped mini kitchen with cookware, utensils, plates, bowls, and cups, along with fresh linens, soft bedding, a comforter, fluffy pillows, towels, cleaning supplies, and a starter set of premium toiletries including shampoo, soap, and conditioner. Everything is set up to feel like a 5 star hotel on wheels, with the freedom to explore wherever the road takes you.RecommendationsWhat to Bring
• Layers for sunny days, cool desert nights
• Cooler for extra food (or add one of ours at checkout)
• Camp chairs, table & shade tarp (or grab our Camp Kit add-ons)
• Gas/propane grill for cookouts
• Generator if you want extended off-grid power
• Hiking shoes, lanterns, sunscreen, bug spray & reusable water bottle
• Charging cords + a few comforts: blanket, games, road-trip playlist
Other things to noteWe take great pride in keeping the van clean, comfortable, and adventure ready for every guest. Please treat it with care and return it in the same condition you received it, with trash removed, the interior reasonably clean, and applicable tanks emptied. Please note that smoking, vaping, and pets are not allowed.
Highly responsive
Spotless
Well maintained
Show more

Quick summary

AI generated

  • Experience luxury off-grid adventures in this premium AWD Sprinter van.

  • Solar power, AC, and hot water let you explore deep in comfort.

  • Just pack clothes; this fully-stocked hotel-on-wheels is adventure-ready.

  • Confidently explore any terrain in this easy-to-drive van with host support.

2024 MERCEDES-BENZ Sprinter 2500 AWD

Length

23 ft

Transmission

Automatic

Fuel Type

Diesel

Tank Size

24 gal

Gross Weight

9,050 lbs

Sleeps

3

Seatbelts

4

Floor plan
Sleeping arrangements

1 bed

Cozy RV rental bed with a plaid blanket, looking out to a serene forest path. Perfect for nature travel.. MERCEDES-BENZ Sprinter 2500 AWD 2024
Inside an RV rental: light wood cabinets, slatted ceiling with vent, cozy bed, and side windows.. MERCEDES-BENZ Sprinter 2500 AWD 2024

Queen bed

1

Luxury 2024 AWD Sprinter Camper Van, Sleeps 3 w/ Indoor Shower

Popular choice! 220 views this month

Add dates for prices

Guest reviews
5.0

Excellent

16 reviews

Overall rating

5

4

3

2

1

Communication

5.0

Top 5% in California

Cleanliness

5.0

Top 5% in California

Maintenance

5.0

Top 5% in California

Value

5.0

Top 5% in California

Listing accuracy

5.0

Top 5% in California

Review summary

Communicative, helpful, provided guidance

Hosts Heather and George were consistently communicative and highly responsive to questions. They were very helpful and accommodating, providing a detailed walkthrough at pickup and an easy-to-understand instruction guide.

Drives smoothly, feels smaller

The van drives smoothly and handles well, feeling like a smaller vehicle thanks to cameras and sensors. It's immaculately clean, well-maintained, and fully equipped for camping with a functional solar grid, shower, and comfortable amenities, including a perfect car seat fit.

Guests love it for luxury
Shaahin A.

October 2026

5.0

We had a great experience renting this RV! It was very clean, well-maintained, and equipped with great amenities that made our trip comfortable and enjoyable. The owner was extremely thoughtful and attentive, following up to make sure everything was working properly. He was also very responsive and available even late at night whenever we had questions. We really appreciated his care and hospitality. Highly recommend!

Robbie C.

September 2026

5.0

Fully equipped for camping, drives like a car , the owners are great.

Joe D.

September 2026

5.0

The vehicle was amazing, the communication was superb and the overall amenities were extremely good. Whenever we had questions, they responded right away.

P
Peter C.

August 2026

5.0

The host was very accommodating and communicative. We are looking to purchase our own camper van and we wanted to try out the Sprinter van. It did not disappoint!

Tyaberg T.

August 2026

5.0

Amazing van and Wonderful hosts! George and Heather were very helpful in coordination and provided the van in emasculate condition, I felt like we were driving it new from the dealership. We took it for a weekend trip to the Eastern Sierras and had a great trip. Having never driven a van like this before I was intimidated at first but impressed with how well it handled. With the visibility through the camera-rear-view-mirror and other sensors, the van felt like a much smaller vehicle. All around a fantastic weekend getaway, thank you for the rental!

Guest Photos

Review photo 1
Review photo 1
Review photo 2
Review photo 3
Review photo 4
Review photo 1
Review photo 2
Review photo 3
Review photo 4
Review photo 5
Features
2024 MERCEDES-BENZ Sprinter 2500 AWD
  • Sleeps 3
  • 4 seatbelts
  • Fresh water: 33 gal
  • Fuel type: Diesel
  • Fuel capacity: 24 gal
  • Automatic transmission
Amenities
  • Linens included
  • Toilet
  • Inside Shower
  • Outside Shower
  • Toilet paper
  • Toiletries
  • Hot water
  • Solart
  • Water hookup
Location

Valencia, CA  •  Exact location provided after booking

Rules and policies
Welcome to your Adventure Van! We’re excited for your upcoming trip! To make your journey smooth and comfortable, we’ve included a few essentials and friendly reminders before you hit the road. Non-negotiable rules. - No smoking or vaping inside the van - No pets allowed - Diesel fuel only, and return the tank full - No extreme off-roading or driving on rough, unmaintained terrain - No climbing, sitting, or storing items on the roof - Use all water, electrical, and sewer hookups properly - Report any damage, accidents, or issues immediately - Return the van on time, with trash removed, the interior reasonably clean, and applicable tanks emptied Violations of the no smoking, no pets, fueling, cleaning, or misuse policies may result in additional cleaning, damage, or recovery fees. Please treat the van with care and return it in the same condition you received it. We hope you have an amazing time to relax, explore, and make unforgettable memories. Safe travels, Heather
  • 4 p.m. start time
    11 a.m. end time
  • Music festival friendly
  • Tailgating friendly
  • Not pet friendly
  • No smoking
  • Mileage: 100 free miles / day
  • No generator
Cancellation: Moderate
Frequently asked questions

Q.

How many people can sleep in the van?

A.

The queen bed comfortably sleeps two, adults and one child, with flexible seating for up to 4 travelers by day.

Q.

Is there a bathroom?

A.

Yes. a private portable indoor toilet plus both an indoor hot water shower and an outdoor rinse shower.

Q.

Do you allow pets?

A.

No. To keep the van fresh for every guest, we're pet-free and smoke/vape-free.

Q.

What's the mileage allowance?

A.

100 miles per day are included, with additional miles at $0.75/mile plenty for most trips, with easy top-ups if you're going the distance.

Meet your host, Heather

Superhost • Member since 2025

Heather is a Superhost

Superhosts are highly-rated and experienced, ensuring you have a fantastic outdoor experience.

  • Typically responds in less than 6 hours

  • Cancelled 0 of 18 trips in the past 12 months · 0%

Big fan of open roads, good food, and starry nights. I love helping others experience the joy of van life and spontaneous getaways!
Add dates for prices5.0 · 19 trips